When Elm Construction & Design broke ground for a new state-of-the-art Asheville Yoga Center, they knew the clock was ticking. They won the construction bid based on speeding up the building cycle. To achieve this, they relied on an above ground application ofXi™从混凝土预制板Superior Walls of North Carolina.
“The AG™ Wall System is a fast, efficient way to construct homes and commercial projects from the ground up,” says Trey Greer, owner of榆树工程建设与设计in Asheville. “For the Asheville Yoga Center, this is a great application because we can bury part of the wall below grade, construct sidewalks right up against the wall system, and then create the entire building out of the precast wall panels. We’re cutting almost a month off a typical construction schedule by using the高级Walls®products.”
The one-story building will combine with an existing building, adding more bathrooms, changing rooms, and classrooms to the popular Asheville facility.
“我们会从我们目前的空间移动与1400平方英尺超过3400平方英尺相结合,让我们为我们的课程和培训,使更多的空间,”阳光Keach,谁共同拥有说阿什维尔瑜伽中心with his wife, Stephanie Keach. “Our growth comes from providing a very high level of service and being responsive to market needs. We were on the forefront of yoga’s popularity on the East Coast right from the start, and now we’ve developed an exceptional following based on our yoga teacher training certification and the daily usage of our facility by Asheville area residents.
“We’re very pleased to have the ability to expand our facility by having the new building constructed with environmentally-friendly wall panels," says Sunny. "These energy-efficient walls will help lower our long-term energy costs by reducing energy leakage.”
Problem/Solution
“This new building sits on a gently sloping lot with the floor level 3' below grade at the back of the building,” says Sunny. “We knew we didn’t want to build with block, but we wanted a tight and well insulated structure. We also knew we wanted a single plane on the interior walls, which proved a challenge in the detailing with block below grade and stick framing above.
“高级墙是在此基础上的特殊挑战的理想解决方案。我们曾考虑他们在过程的早期榆树建设与设计他们建议,以帮助理清了水的渗透问题,“阳光解释说,”这令人印象深刻的产品实际上有助于减少浪费的事实,安装迅速,并消除了对销售的基础需要我们的产品“。
The Xi wall panels used to construct the new Asheville Yoga Center have earned the Green Approved Product designation from the National Association of Home Builders Research Center. Manufactured by Superior Walls of North Carolina, the walls systems can earn up to 13 points on a project toward National Green Building Certification.
顶级的所述线的僖墙板设有钢筋DOW®泡沫塑料™绝缘创建针对侧壁渗透水的永久屏障的混凝土和2 1/2" 。所述面板被定制设计和构造在工厂控制。设定西安墙板包括独特的功能:
5,000+ psi concrete;
内部顶部和底部梁水平钢筋;
Vertical steel rebar inside each stud;
Steel-reinforced top bond beams, concrete studs, and footer beams;
Access holes for ease in wiring and plumbing;
Galvanized steel stud facing ready for drywall finishing; and
Insulated corners, studs, and bond beams.
的高级墙墙板是资源有效的,在一个新的结构比常规混凝土墙最多使用少70%的混凝土。梭哈饰面之前,内部装修省去了额外的木框架的需要。使用更少的材料有助于减少新大楼的建设过程中的碳足迹。
欲了解更多信息榆树建设与设计访问www.elmconstruction.com. Additional details on Superior Walls by North Carolina, an authorized dealer of Superior Walls, can be found atwww.superiorwallsnc.com. And, details on the new Asheville Yoga Center project are located atwww.youryoga.com.
Superior Walls
可在全国通过各种状态的被许可人,高级墙基础已经从1981年时,该公司推出了最初的R-5高级墙面预制基础系统安装。高级墙产品是第一个也是唯一的基础系统由NAHB研究中心已获得绿色批准的产品名称,就向国家绿色建筑认证项目赢得建设者点。该公司是国际规范委员会和美国绿色建筑委员会的成员。欲了解更多信息,请致电1-800-452-9255或访问www.superiorwalls.com