David A. Todd

David A. Todd

A senior engineer and corporate trainer of engineering for CEI Engineering Associates, Inc. David has 36 years of experience as a consulting civil engineer. His experience includes water, wastewater, stormwater, roads, and solid waste infrastructure. For much of the last 20 years he has been involved with stormwater issues. Specifications and construction administration have been a specialty of his within civil consulting engineering . He has BS and MS degrees in Civil Engineering, is a registered engineer in four states, and a Certified Professional in Erosion and Sediment Control.

Asphalt Pavement for Solar Power: The Future, or a Dream?

Asphalt Pavement for Solar Power: The Future, or a Dream?

Thu, Feb 09, 2012

Reduce, reuse, recycle. This is the simplest mantra of the environmental movement and the guiding principle for families and small programs across the nation. How does this principle apply toinfrastructure, specificallyasphalt pavement? We already use as little asphalt pavement as we can, but this is more an economic decision. We recycle asphalt pavement to build new pavement. We reuse it as clean fill. What else can we do with it? Can we use it to collect solar energy?

U.S. Infrastructure:  Small Flood Control

U.S. Infrastructure: Small Flood Control

Thu, Feb 09, 2012

The American Society of Civil Engineers (ASCE) includesLeveeson its2009 Report Card for America's Infrastructure, giving them aD–. The category of "Levees" covers major flood control works. However, what about the water that causes the flooding that levees protect against? Throughout drainage basins comprising thousands of square miles,stormwaterrunoff makes its way downstream. Obviously some systems convey that stormwater and even control it. ASCE says nothing about these storm sewer systems, but they form a vital part of America's infrastructure.

Asphalt Pavement Solar Collectors: The Future is Now

Asphalt Pavement Solar Collectors: The Future is Now

Thu, Feb 09, 2012

For several years universities in the United States have been looking into the feasibility of using asphalt pavement to collect solar energy, or, more correctly, to harvest the solar energy that asphalt pavement is already collecting. Researchers have found that the technology exists for harvesting this energy, and its implementation may not be that far off.

Dealing with Discrepencies Between a Contracted Price and the Final Payment Application

Dealing with Discrepencies Between a Contracted Price and the Final Payment Application

Fri, Feb 10, 2012

Welcome to the On Site channel’s Construction Administration Column. What should you do when there is a discrepancy between the amount on a payment application and the amount that was contracted? Here David A. Todd, P.E., CPESC, gives his opinion.

Columnist David A. Todd, P.E., CPESC, has 37 years of experience in the architecture, engineering, and construction (AEC) industry and has performed much construction administration during that time. He will answer questions from our readers or from his own practice and will provide answers based on his understanding of the construction process and administration of the construction contract. The focus will be on the customary duties of the owner, contractor, and design professional as typically described in the contract documents.

Erosion Control Grows Up

Erosion Control Grows Up

Thu, Feb 02, 2012

When I began my career in the engineering/construction industry 37 years ago, erosion from construction sites was never a stated concern. None of the hugewater treatment plantsandwastewater treatment plantsI designed had any provisions for preventing erosion or controlling sediment. The streams, lakes, and rivers downstream from my sites no doubt did a lot of natural “settling” and maybe “filtration.”

The Critical Nature of Specifications When Bidding and Billing Contract Work

The Critical Nature of Specifications When Bidding and Billing Contract Work

Fri, Jan 27, 2012

Welcome to the On Site channel’s Construction Administration Column. Who should pay when work is done out of contract? Here David A. Todd, P.E., CPESC, gives his opinion.

Columnist David A. Todd, P.E., CPESC, has 37 years of experience in the architecture, engineering, and construction (AEC) industry and has performed much construction administration during that time. He will answer questions from our readers or from his own practice and will provide answers based on his understanding of the construction process and administration of the construction contract. The focus will be on the customary duties of the owner, contractor, and design professional as typically described in the contract documents.

Timing Your Change Orders

Timing Your Change Orders

Fri, Jan 13, 2012

Welcome to the On Site channel’s Construction Administration Column. What should you do if a contractor fails to ask for a change order in a timely manner? Here David A. Todd, P.E., CPESC, gives his opinion.

Columnist David A. Todd, P.E., CPESC, has 37 years of experience in the architecture, engineering, and construction (AEC) industry and has performed much construction administration during that time. He will answer questions from our readers or from his own practice and will provide answers based on his understanding of the construction process and administration of the construction contract. The focus will be on the customary duties of the owner, contractor, and design professional as typically described in the contract documents.

Performance and Payment Bonds

Performance and Payment Bonds

Fri, Dec 16, 2011

Welcome to the On Site channel’s Construction Administration Column. Unsure of how to handle bond submittals? Here David A. Todd, P.E., CPESC, gives his opinion.

Columnist David A. Todd, P.E., CPESC, has 37 years of experience in the architecture, engineering, and construction (AEC) industry and has performed much construction administration during that time. He will answer questions from our readers or from his own practice and will provide answers based on his understanding of the construction process and administration of the construction contract. The focus will be on the customary duties of the owner, contractor, and design professional as typically described in the contract documents.

Shop Drawing Approval Procedures

Shop Drawing Approval Procedures

Fri, Dec 02, 2011

Welcome to the On Site channel’s first Construction Administration Column. David A. Todd, P.E., CPESC, gives his opinion on a common issue with shop drawing approval.

Columnist David A. Todd, P.E., CPESC, has 37 years of experience in the architecture, engineering, and construction (AEC) industry and has performed much construction administration during that time. He will answer questions from our readers or from his own practice and will provide answers based on his understanding of the construction process and administration of the construction contract. The focus will be on the customary duties of the owner, contractor, and design professional as typically described in the contract documents.

Erosion Control Grows Up

Erosion Control Grows Up

Fri, Jun 10, 2011

When I began my career in the engineering/construction industry 37 years ago, erosion from construction sites was never a stated concern. None of the hugewater treatment plantsandwastewater treatment plantsI designed had any provisions for preventing erosion or controlling sediment. The streams, lakes, and rivers downstream from my sites no doubt did a lot of natural “settling” and maybe “filtration.”