大卫·a·托德 在建筑,可持续设计,来自世界各地的DIY理念和建设项目的最新 - Buildipedia包括与视频,文章和社交网络的整个建筑环境。//www.diesprinter.com 星期五,2020年8月7日01:21:26 +0000 的Joomla!1.5 - 开源内容管理 EN-GB 遵循EJCDC一般条件的理由 //www.diesprinter.com/aec-pros/from-the-job-site/reasons-to-follow-the-ejcdc-general-conditions //www.diesprinter.com/aec-pros/from-the-job-site/reasons-to-follow-the-ejcdc-general-conditions
遵循EJCDC一般条件的原因

欢迎来到本站频道的建设管理栏目。在此,David Todd解释了EJCDC一般条件是如何作为建立公平、客观的合同关系以及减少建设项目各方之间冲突和诉讼的最佳方式发展起来的。< /强> < / p > < / div > norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 星期四,2012年8月9日5时00分01秒+0000 为什麽更改建筑施工因天气而延误的标准语言? //www.diesprinter.com/aec-pros/from-the-job-site/why-change-standard-language-regarding-weather-delays-in-construction //www.diesprinter.com/aec-pros/from-the-job-site/why-change-standard-language-regarding-weather-delays-in-construction

为什么更改标准语言关于天气在施工中的延迟?

Welcome to the On Site channel’s Construction Administration Column. Join us as we continue a conversation regarding contracts and weather delays.

In David Todd’s last Construction Administration Column, he recommended an alternative to standard language regarding weather delays. David’s suggestion spurred some discussion of the topic, so here are his further thoughts.

norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 2012年6月22日星期五05:00:01 +0000 如何确定建设工程施工合同开始日期开始后 //www.diesprinter.com/aec-pros/from-the-job-site/how-to-determine-a-construction-start-date-after-the-fact //www.diesprinter.com/aec-pros/from-the-job-site/how-to-determine-a-construction-start-date-after-the-fact
“如何确定建设工程施工合同开始日期后开始”/

Welcome to the On Site channel’s Construction Administration Column. If you are midway through a project, how do you determine the official start date?

Columnist David A. Todd, P.E., CPESC, has 37 years of experience in the architecture, engineering, and construction (AEC) industry and has performed much construction administration during that time. He will answer questions from our readers or from his own practice and will provide answers based on his understanding of the construction process and administration of the construction contract. The focus will be on the customary duties of the owner, contractor, and design professional as typically described in the contract documents.

norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 2012年6月8日星期五05:00:01 +0000
更改合同措辞以适应天气延误 //www.diesprinter.com/aec-pros/construction-materials-and-methods/changing-contract-wording-to-accommodate-weather-delays //www.diesprinter.com/aec-pros/construction-materials-and-methods/changing-contract-wording-to-accommodate-weather-delays
更改合同用语以适应天气延误

欢迎来到现场频道的建设管理栏目。在这里,David A. Todd给出了他对工程师联合合同文件委员会(EJCDC)关于天气的一般条件条款的建议。在我的最后一列,我处理了一个关于天气延误的问题。我给出的答案与2002版EJCDC通用条件中的天气规定有关。这些规定是:

norman_d_gutter@yahoo.com(大卫·托德) 建筑材料与方法 周三,2012五时00分01秒+0000 5月23日
支付额外的时间,由于天气延迟一承包商 //www.diesprinter.com/aec-pros/from-the-job-site/defining-appropriate-weather-delays-in-a-contract //www.diesprinter.com/aec-pros/from-the-job-site/defining-appropriate-weather-delays-in-a-contract
支付承包商由于天气延误的额外时间

欢迎来到现场频道的建设管理栏目。在合同中,当进度超过最后期限,超额开票时,如何定义异常天气条件?>专栏作家David A. Todd, p.e., CPESC,在建筑、工程和建筑(AEC)行业有37年的经验,在那段时间里执行了很多建筑管理工作。他会回答我们的读者或从自己的实践问题,并基于他对施工过程的理解就可以得到答案。 norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 星期五,2012 5时00分02秒+0000 5月11日 不合格沥青的处理责任 //www.diesprinter.com/aec-pros/from-the-job-site/handling-liability-when-the-end-product-isnt-up-to-code //www.diesprinter.com/aec-pros/from-the-job-site/handling-liability-when-the-end-product-isnt-up-to-code

处理不合格沥青的责任

欢迎来到本站频道建设管理栏目。本专栏涵盖了沥青工程被判定为不合格时的责任问题。>专栏作家David A. Todd, p.e., CPESC,在建筑、工程和建筑(AEC)行业有37年的经验,在那段时间里执行了很多建筑管理工作。他将回答读者提出的问题或自己的实践,并根据自己对施工过程和施工合同管理的理解提供答案。焦点将在业主,承包商的职责习惯,并且如在合同文件通常被描述专业设计。 norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 2012年4月26日星期四05:00:01 +0000 监理对工作现场分包商 //www.diesprinter.com/aec-pros/from-the-job-site/supervision-for-subcontractors-on-the-job-site //www.diesprinter.com/aec-pros/from-the-job-site/supervision-for-subcontractors-on-the-job-site “监督用于在工作现场分包商”/

Welcome to the On Site channel’s Construction Administration Column. This column covers the question of adequate supervision for subcontractors on the job site. Here David A. Todd, P.E., CPESC, gives his opinion.

Columnist David A. Todd, P.E., CPESC, has 37 years of experience in the architecture, engineering, and construction (AEC) industry and has performed much construction administration during that time. He will answer questions from our readers or from his own practice and will provide answers based on his understanding of the construction process and administration of the construction contract. The focus will be on the customary duties of the owner, contractor, and design professional as typically described in the contract documents.

norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 星期五,2012年4月13日5时00分01秒+0000 业主代表可否直接与分包商接洽? //www.diesprinter.com/aec-pros/from-the-job-site/can-an-owners-representative-deal-directly-with-a-sub-contractor //www.diesprinter.com/aec-pros/from-the-job-site/can-an-owners-representative-deal-directly-with-a-sub-contractor
业主代表是否可以直接与分包商交易?

Welcome to the On Site channel’s Construction Administration Column. When a construction observer gives instructions directly to a subcontractor, it can lead to contentious claims. David A. Todd, P.E., CPESC, discusses how to address the issue.

Columnist David A. Todd, P.E., CPESC, has 37 years of experience in the architecture, engineering, and construction (AEC) industry and has performed much construction administration during that time. He will answer questions from our readers or from his own practice and will provide answers based on his understanding of the construction process.

norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 周五,2012年3月16日5时00分01秒+0000
施工观察员培训计划 //www.diesprinter.com/aec-pros/from-the-job-site/construction-observer-training-programs //www.diesprinter.com/aec-pros/from-the-job-site/construction-observer-training-programs “施工观察员培训课程”/

什么是建筑观察员列车的最佳方式?Learning from a professional on site may be ideal, but other good sources of information include public agencies and the documentation they make available.

Columnist David A. Todd, P.E., CPESC, has 37 years of experience in the architecture, engineering, and construction (AEC) industry and has performed much construction administration during that time. He will answer questions from our readers or from his own practice and will provide answers based on his understanding of the construction process.

norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 2012年2月24日星期五05:00:01 +0000
美国废水基础设施:资金问题和老化的系统 //www.diesprinter.com/雷竞技raybeknowledgebase/division-33-utilities/33-30-00-sanitary-sewerage-utilities/us-wastewater-infrastructure-funding-issues-and-aging-systems //www.diesprinter.com/雷竞技raybeknowledgebase/division-33-utilities/33-30-00-sanitary-sewerage-utilities/us-wastewater-infrastructure-funding-issues-and-aging-systems
U.S. Wastewater Infrastructure: Funding Issues and Aging Systems

Wastewater systems is the sixth topic in our U.S. infrastructure series. The American Society of Civil Engineers (ASCE) assigned the United States’ WASTEWATER infrastructure a grade of “D-” on their 2009 Report Card for America’s Infrastructure. Here we explore the funding issues that effect the aging treatment plants and waterways that make up our nation's wastewater infrastructure.

norman_d_gutter@yahoo.com(大卫·托德) 33 000个卫生污水设施 星期四,2012年2月9日16时45分22秒+0000
沥青路面的太阳能发电:未来,还是一个梦想? //www.diesprinter.com/雷竞技raybeknowledgebase/division-33-utilities/33-10-00-water-utilities/33-12-00-water-utility-distribution-equipment/asphalt-pavement-for-solar-power-the-future-or-a-dream //www.diesprinter.com/雷竞技raybeknowledgebase/division-33-utilities/33-10-00-water-utilities/33-12-00-water-utility-distribution-equipment/asphalt-pavement-for-solar-power-the-future-or-a-dream

Reduce, reuse, recycle. This is the simplest mantra of the environmental movement and the guiding principle for families and small programs across the nation. How does this principle apply to infrastructure, specifically asphalt pavement? We already use as little asphalt pavement as we can, but this is more an economic decision. We recycle asphalt pavement to build new pavement. We reuse it as clean fill. What else can we do with it? Can we use it to collect solar energy?

norman_d_gutter@yahoo.com(大卫·托德) 33 12 00水务配电设备 星期四,2012年2月9日十六时34分33秒+0000
美国基础设施:小防汛 //www.diesprinter.com/雷竞技raybeknowledgebase/division-33-utilities/33-40-00-storm-drainage-utilities/us-infrastructure-small-flood-control //www.diesprinter.com/雷竞技raybeknowledgebase/division-33-utilities/33-40-00-storm-drainage-utilities/us-infrastructure-small-flood-control

The American Society of Civil Engineers (ASCE) includes Levees on its 2009 Report Card for America's Infrastructure, giving them a D–. The category of "Levees" covers major flood control works. However, what about the water that causes the flooding that levees protect against? Throughout drainage basins comprising thousands of square miles, stormwater runoff makes its way downstream. Obviously some systems convey that stormwater and even control it. ASCE says nothing about these storm sewer systems, but they form a vital part of America's infrastructure.

norman_d_gutter@yahoo.com(大卫·托德) 33,4000个暴雨排水设施 2012年2月9日星期四16:28:06 +0000
沥青路面太阳能收集器:未来就是现在 //www.diesprinter.com/雷竞技raybeknowledgebase/division-32-exterior-improvements/32-10-00-bases-ballasts-and-paving/32-12-00-flexible-paving/asphalt-pavement-solar-collectors-未来是现在 //www.diesprinter.com/雷竞技raybeknowledgebase/division-32-exterior-improvements/32-10-00-bases-ballasts-and-paving/32-12-00-flexible-paving/asphalt-pavement-solar-collectors-未来是现在 “沥青路面太阳能收集:未来就是现在”/

有关在美国几年的大学一直在寻找到使用沥青路面收集太阳能,或者更正确地说,收获太阳能是沥青路面的可行性已经收集。研究人员发现,以技术为收获存在这种能量,它的执行情况可能并不那么遥远。 norman_d_gutter@yahoo.com(大卫·托德) 32 12 00柔性铺装 星期四,2012年2月9日16时24分02秒+0000 处理合同价格和最终付款申请之间的差异 //www.diesprinter.com/aec-pros/from-the-job-site/dealing-with-discrepencies-between-a-contracted-price-and-the-final-payment-application //www.diesprinter.com/aec-pros/from-the-job-site/dealing-with-discrepencies-between-a-contracted-price-and-the-final-payment-application “用合同价格和最终付款应用之间的差异过处理”

Welcome to the On Site channel’s Construction Administration Column. What should you do when there is a discrepancy between the amount on a payment application and the amount that was contracted? Here David A. Todd, P.E., CPESC, gives his opinion.

Columnist David A. Todd, P.E., CPESC, has 37 years of experience in the architecture, engineering, and construction (AEC) industry and has performed much construction administration during that time. He will answer questions from our readers or from his own practice and will provide answers based on his understanding of the construction process and administration of the construction contract. The focus will be on the customary duties of the owner, contractor, and design professional as typically described in the contract documents.

norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 2012年2月10日星期五05:00:01 +0000
侵蚀控制长大 //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/erosion-control-grows-up //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/erosion-control-grows-up < div class = " K2FeedImage " > < img src = " //www.diesprinter.com/media/k2/items/cache/07dab03de8c7702ed11a3f082edd419f_S.jpg " alt = "侵蚀控制长大" / > < / div > < div class = " K2FeedIntroText " > < p >当我开始我的职业生涯在工程/建筑行业37年前,侵蚀从建筑工地从未表示担忧。没有一个巨大的< a href = " //www.diesprinter.com/operations/public-infrastructure/item/1345-case-study-water-supply-infrastructure " target = " _self”>水处理厂< / >和< a href = " //www.diesprinter.com/operations/public-infrastructure/item/1349-case-study-wastewater-infrastructure " target = " _self”>污水处理厂设计> < /我有任何规定防止侵蚀或控制沉积物。在河流,湖泊,从我的站点下游河流无疑做了很多天然的“沉淀”,也许的“过滤”。 norman_d_gutter@yahoo.com(大卫·托德) 31 20 00土方 2012年2月2日星期四19:14:55 +0000 投标和计费合同工作时规范的关键性质 //www.diesprinter.com/aec-pros/from-the-job-site/the-critical-nature-of-specifications-when-bidding-and-billing-contract-work //www.diesprinter.com/aec-pros/from-the-job-site/the-critical-nature-of-specifications-when-bidding-and-billing-contract-work
投标和结算合同工作时规范的关键性质

欢迎来到网站频道建设管理栏目。合同外的工作由谁支付?以下是David A. Todd, p.e., CPESC的观点。>专栏作家David A. Todd, p.e., CPESC,在建筑、工程和建筑(AEC)行业有37年的经验,在那段时间里执行了很多建筑管理工作。他将回答读者提出的问题或自己的实践,并根据自己对施工过程和施工合同管理的理解提供答案。焦点将在业主,承包商的职责习惯,并且如在合同文件通常被描述专业设计。 norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 2012年1月27日星期五05:00:01 +0000 更改订单的时间安排 //www.diesprinter.com/aec-pros/from-the-job-site/timing-your-change-orders //www.diesprinter.com/aec-pros/from-the-job-site/timing-your-change-orders

定时您的更改命令

欢迎来到本站频道建设管理栏目。如承建商未能及时要求更改订单,你应怎么办?以下是David A. Todd, p.e., CPESC的观点。>专栏作家David A. Todd, p.e., CPESC,在建筑、工程和建筑(AEC)行业有37年的经验,在那段时间里执行了很多建筑管理工作。他将回答读者提出的问题或自己的实践,并根据自己对施工过程和施工合同管理的理解提供答案。焦点将在业主,承包商的职责习惯,并且如在合同文件通常被描述专业设计。 norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 2012年1月13日星期五05:00:01 +0000 性能和支付债券 //www.diesprinter.com/aec-pros/from-the-job-site/performance-and-payment-bonds //www.diesprinter.com/aec-pros/from-the-job-site/performance-and-payment-bonds

Performance and Payment Bonds

欢迎来到网站频道建设管理栏目。不知道如何处理债券提交?以下是David A. Todd, p.e., CPESC的观点。>专栏作家David A. Todd, p.e., CPESC,在建筑、工程和建筑(AEC)行业有37年的经验,在那段时间里执行了很多建筑管理工作。他将回答读者提出的问题或自己的实践,并根据自己对施工过程和施工合同管理的理解提供答案。焦点将在业主,承包商的职责习惯,并且如在合同文件通常被描述专业设计。 norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 2011年12月16日星期五05:00:01 +0000 施工图审批程序 //www.diesprinter.com/aec-pros/from-the-job-site/shop-drawing-approval-procedures //www.diesprinter.com/aec-pros/from-the-job-site/shop-drawing-approval-procedures

施工图审批流程

欢迎来到网站频道的第一个建设管理栏目。David a . Todd, p.e., CPESC,给出了他对车间图纸批准的一个常见问题的看法。>专栏作家David A. Todd, p.e., CPESC,在建筑、工程和建筑(AEC)行业有37年的经验,在那段时间里执行了很多建筑管理工作。他将回答读者提出的问题或自己的实践,并根据自己对施工过程和施工合同管理的理解提供答案。焦点将在业主,承包商的职责习惯,并且如在合同文件通常被描述专业设计。 norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 2011年12月2日星期五05:00:01 +0000 侵蚀控制长大 //www.diesprinter.com/aec-pros/construction-materials-and-methods/erosion-control-grows-up //www.diesprinter.com/aec-pros/construction-materials-and-methods/erosion-control-grows-up “侵蚀控制在成长”/

当我37年前就开始了我在工程/建筑行业的职业生涯,从建筑工地的侵蚀从来没有一个既定的关注。没有一个巨大的< a href = " //www.diesprinter.com/operations/public-infrastructure/item/1345-case-study-water-supply-infrastructure " target = " _self”>水处理厂< / >和< a href = " //www.diesprinter.com/operations/public-infrastructure/item/1349-case-study-wastewater-infrastructure " target = " _self”>污水处理厂设计> < /我有任何规定防止侵蚀或控制沉积物。在河流,湖泊,从我的站点下游河流无疑做了很多天然的“沉淀”,也许的“过滤”。 norman_d_gutter@yahoo.com(大卫·托德) 建筑材料与方法 2011年6月10日星期五05:00:01 +0000 沥青路面太阳能收集器:未来就是现在 //www.diesprinter.com/aec-pros/engineering-news/asphalt-pavement-solar-collectors-the-future-is-now //www.diesprinter.com/aec-pros/engineering-news/asphalt-pavement-solar-collectors-the-future-is-now “沥青路面太阳能收集:未来就是现在”/

有关在美国几年的大学一直在寻找到使用沥青路面收集太阳能,或者更正确地说,收获太阳能是沥青路面的可行性已经收集。研究人员发现,以技术为收获存在这种能量,它的执行情况可能并不那么遥远。 norman_d_gutter@yahoo.com(大卫·托德) 工程新闻 星期四,2011 5点00分01秒+0000 5月26日 美国学校基础设施:资金够吗? //www.diesprinter.com/aec-pros/public-infrastructure/us-schools-infrastructure-is-funding-enough //www.diesprinter.com/aec-pros/public-infrastructure/us-schools-infrastructure-is-funding-enough

“中美学校基础设施:?是资金够了”/

“Assessing the conditions of the nation’s public schools remains a difficult process,” says the American Society of Civil Engineers (ASCE) in their 2009 Report Card for America's Infrastructure. The problem leading to this "D" grade seems to be funding. However, part of the problem is that we don’t know how much of a problem we have.

norman_d_gutter@yahoo.com(大卫·托德) 公共基础设施 2011年3月10日星期四05:00:01 +0000 水晶桥美国艺术博物馆:工程与建筑的结合 //www.diesprinter.com/aec-pros/engineering-news/crystal-bridges-museum-of-american-art-marrying-engineering-and-architecture //www.diesprinter.com/aec-pros/engineering-news/crystal-bridges-museum-of-american-art-marrying-engineering-and-architecture
“美国艺术的水晶桥博物馆:嫁建筑工程”/

当完,水晶桥博物馆将提供多方位的享受的游客。“The water features are intended to give an alternate experience to the art exhibits,” says Hugh Phillips, R.A., the project manager and a principal at Safdie Architects, the Museum’s architectural design firm. “We had the choice to keep the stream natural with its frequent low flow or to construct ponds and provide a larger body of water to make the water more significant.” Although both were good choices, given the natural beauty of this narrow valley about a mile northeast of downtown Bentonville, Arkansas, Safdie Architects elected to go with the larger water feature.

norman_d_gutter@yahoo.com(大卫·托德) 工程新闻 2011年2月23日星期三05:00:01 +0000
美国基础设施:小防汛 //www.diesprinter.com/aec-pros/public-infrastructure/us-infrastructure-small-flood-control //www.diesprinter.com/aec-pros/public-infrastructure/us-infrastructure-small-flood-control
U.S. Infrastructure: Small Flood Control

The American Society of Civil Engineers (ASCE) includes Levees on its 2009 Report Card for America's Infrastructure, giving them a D–. The category of "Levees" covers major flood control works. However, what about the water that causes the flooding that levees protect against? Throughout drainage basins comprising thousands of square miles, stormwater runoff makes its way downstream. Obviously some systems convey that stormwater and even control it. ASCE says nothing about these storm sewer systems, but they form a vital part of America's infrastructure.

norman_d_gutter@yahoo.com(大卫·托德) 公共基础设施 2011年1月21日星期五05:00:01 +0000
从招聘网站:美国艺术的水晶桥博物馆 //www.diesprinter.com/aec-pros/from-the-job-site/from-the-job-site-crystal-bridges-museum-of-american-art //www.diesprinter.com/aec-pros/from-the-job-site/from-the-job-site-crystal-bridges-museum-of-american-art < div class = " K2FeedImage " > < img src = " //www.diesprinter.com/media/k2/items/cache/cc49f8fe58339a73a36a496e4b8c3389_S.jpg " alt = "从工作地点:水晶桥美国艺术博物馆" / > < / div > < div class = " K2FeedIntroText " > < p >的< a href = " http://crystalbridgesmuseum.org/public/ " target = "平等" >水晶桥美国艺术博物馆< / >,位于阿肯色州本顿维尔已经远远足够完成日程已经敲定。水晶桥博物馆将于2011年11月11日开放:漫长的过程终于接近尾声。2006年开始建设,目前稳步推进。这个项目很复杂,场地很有挑战性,建筑本身也有不同寻常的特点。< / p > < / div > norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 星期四,2011年1月6日5时00分01秒+0000 美国道路基础设施:安全、拥堵和道路状况 //www.diesprinter.com/aec-pros/public-infrastructure/us-roads-infrastructure-safety-congestion-and-road-condition //www.diesprinter.com/aec-pros/public-infrastructure/us-roads-infrastructure-safety-congestion-and-road-condition
< p >的街头类别列表很长,州际公路,农村公路、小动脉道路,收集器的街道,和附近的街道,他们需要保持良好的维修和足够的能力似乎永无止境的需求是巨大的。美国土木工程师协会(ASCE)在其2009年美国基础设施报告卡中,将美国的Roads Infrastructure > /strong> D- "等级划分为" D- "。为什么?该报告强调了安全(以高速公路的伤亡人数衡量)、拥堵和道路状况。它似乎也向州际高速公路系统和主要城市地区倾斜。那些连绵不绝、服务水平较低的公路又如何呢?< / p > < / div > norman_d_gutter@yahoo.com(大卫·托德) 公共基础设施 星期四,2010年12月16日5时00分01秒+0000 沥青路面的太阳能发电:未来,还是一个梦想? //www.diesprinter.com/aec-pros/public-infrastructure/asphalt-pavement-for-solar-power-the-future-or-a-dream //www.diesprinter.com/aec-pros/public-infrastructure/asphalt-pavement-for-solar-power-the-future-or-a-dream

Reduce, reuse, recycle. This is the simplest mantra of the environmental movement and the guiding principle for families and small programs across the nation. How does this principle apply to infrastructure, specifically asphalt pavement? We already use as little asphalt pavement as we can, but this is more an economic decision. We recycle asphalt pavement to build new pavement. We reuse it as clean fill. What else can we do with it? Can we use it to collect solar energy?

norman_d_gutter@yahoo.com(大卫·托德) 公共基础设施 星期四,2010年11月18日5时00分01秒+0000
了解建筑法规 //www.diesprinter.com/aec-pros/from-the-job-site/understanding-the-building-codes //www.diesprinter.com/aec-pros/from-the-job-site/understanding-the-building-codes “了解建筑规范”/

尽职调查。在AEC行业的不同部分,这句话的意思是不同的东西,但他们都归结到这一点:你的功课您规划,设计,建造或之前。在构建码的问题,尽职调查可能意味着一个成功的检查或排斥,如期得到占用和经历延迟之间的区别。 norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 周五,2010年10月29日5时00分01秒+0000 Moshe Safdie的水晶桥美国艺术博物馆 //www.diesprinter.com/aec-pros/from-the-job-site/moshe-safdies-crystal-bridges-museum-of-american-art //www.diesprinter.com/aec-pros/from-the-job-site/moshe-safdies-crystal-bridges-museum-of-american-art

“摩西·萨夫迪的美国艺术的水晶桥博物馆”/

一个一度沉寂的山谷,约市中心的本顿维尔,阿肯色州的一个半英里东北部,是紧张施工的现场。该,由摩西·萨夫迪设计的href="http://crystalbridgesmuseum.org/public/" target="_blank">水晶桥博物馆,已经从地面出现了,它的建筑正在形状。完成后,该博物馆将成为阿肯色州西北部。 主要旅游景点 norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 2010年10月7日星期四05:00:01 +0000 合同管理和收尾工作 //www.diesprinter.com/aec-pros/from-the-job-site/contract-administration-and-closeout //www.diesprinter.com/aec-pros/from-the-job-site/contract-administration-and-closeout “合同管理和收尾”/

施工作业的百分之九十九是在规定时间内完成。获得一个项目收出 - 其他百分之一 - 似乎需要同样多的时间。为什么这个过程花了这么长时间?可以被认为是完整的项目之前似乎永无休止一系列遗留问题清单和文件的项目必须填写。 norman_d_gutter@yahoo.com(大卫·托德) 从工作现场 2010年9月28日星期二05:00:01 +0000