一个项目的灯表金属螺柱框架阶段显着影响其他几个交易。良好的规划和实践将实现更高的生产率和符合项目规格的质量水平并不秘密。规划和布局应该是项目工头的责任;但是,每个人都应该参与编制工作流程。虽然实际布局正在进行中,但也应考虑其他生产项目。 p> div>
混凝土砌体装置(CMU)长期以来一直被认为是砖面的理想备用材料; however, because of increasing installation costs, CMU backup systems have given way to metal stud backup systems. Brick veneer with metal stud backup walls, because they are a very cost effective and versatile wall assembly, are very commonly seen in today’s commercial buildings. The original exterior metal stud wall systems of the 1970’s were simple. They consisted of metal studs at 16 or 24 inches on center, with fiberglass batt insulation having an integral vapor barrier placed in between. Gypsum board sheathing was placed on each side, and 15 pound felt paper was installed over the exterior sheathing. This system eventually would fail and allow air and moisture to enter the building, degrading the insulation and thus the R-Value of the wall, not to mention causing other significant problems. <跨度样式=“字体大小:12pt;”> 非结构金属框架 strong> span>,或灯具仪金属框架,已成为其中之一支持石膏墙的最佳选择。通常,光规金属框架被认为是25Ga的范围。到18克。Non-structural metal studs can be produced from 1 5/8” to 14” widths to meet a great many framing requirements.