32000个土方移动 来自世界各地的最新建筑、可持续设计、DIY理念和建筑项目——Buildipedia用视频、文章和社交网络覆盖了整个建筑环境。//www.diesprinter.com 2020年8月3日星期一21:58:49 +0000 Joomla !1.5 -开放源码内容管理 EN-GB 侵蚀控制长大 //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/erosion-control-grows-up //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/erosion-control-grows-up < div class = " K2FeedImage " > < img src = " //www.diesprinter.com/media/k2/items/cache/07dab03de8c7702ed11a3f082edd419f_S.jpg " alt = "侵蚀控制长大" / > < / div > < div class = " K2FeedIntroText " > < p >当我开始我的职业生涯在工程/建筑行业37年前,侵蚀从建筑工地从未表示担忧。没有一个巨大的< a href = " //www.diesprinter.com/operations/public-infrastructure/item/1345-case-study-water-supply-infrastructure " target = " _self”>水处理厂< / >和< a href = " //www.diesprinter.com/operations/public-infrastructure/item/1349-case-study-wastewater-infrastructure " target = " _self”>污水处理厂设计> < /我有任何规定防止侵蚀或控制沉积物。从我的网站下游的小溪、湖泊和河流无疑做了很多自然的“沉淀”,也许“过滤”。" < / p > < / div > David A. Todd) 32000个土方移动 2012年2月2日星期四19:14:55 +0000 分级 //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-22-00-grading/31-22-00-grading //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-22-00-grading/31-22-00-grading “分级”/

<跨度风格=”字体大小:12磅;“> <强>分级 活动清除拆除碎片,植被和顶部土壤的工程现场之后进行。分级指站点斜率的调整的程度所需的,以促进新的建筑物和场地功能,包括适当的雨水径流梯度和特征。既具有现有的现场调查(包括土壤调查)和新的施工现场规划是理解整个项目区域的起点地形和期望的最终状态的关键。同样重要的是现有的网站的评价土壤以匹配新的建设目的,如基础工作,甚至以方便临时建设需要,如设备的运行和土壤沉积物控制。 staff@www.diesprinter.com (Buildipedia员工) 322分级 2010年7月5日星期一05:00:01 +0000 挖掘 //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-23-16-excavation/31-23-16-excavation //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-23-16-excavation/31-23-16-excavation < div class = " K2FeedIntroText " > < p > < >强开挖< / >强是指删除< a href = " //www.diesprinter.com/division-31-earthwork/item/703-31-05-13-soils-for-earthwork " target = " _self " > < / >土壤以下年级海拔(地面)在项目网站。开挖通常是为了将基础结构、公用设施和地下室置于地面以下的临时需要。挖掘时要考虑的因素包括工作地点土壤的特性、需要挖走的土壤的深度和数量,以及包括邻近建筑物和物业线在内的任何场地限制因素。根据地下水位的高度和被挖掘土壤的透水性,如果需要干燥的工作环境,可能需要a>。< / p > < / div > staff@www.diesprinter.com (Buildipedia员工) 31 23 16挖掘 星期五,2009年8月14日17:06:49 +0000 脱水 //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-23-19-dewatering/31-23-19-dewatering //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-23-19-dewatering/31-23-19-dewatering < div class = " K2FeedIntroText " > < p > < >强脱水< /强>与< a href = " //www.diesprinter.com/division-31-earthwork/item/695-31-23-16-excavation " target = " _self”>发掘< / >哪里有需要工作在干燥土壤不受水位影响项目网站或水分。决定执行脱水在挖掘现场是由底部的开挖高程,水位的高度,渗透和饱和的土壤,程度< A href = " //www.diesprinter.com/division-31-earthwork/item/697-31-32-00-soil-stabilization " target = " _self”>稳定< / >需要开挖的边缘,和正在执行的工作的时间和性质。用于脱水工作的设备和泵的类型也由这些因素决定。

< span风格=“无衬线字体类型:arial, helvetica;”> <跨风格= "字体大小:小;颜色:# 000000;" > < / span > < / span > < / p > < / div > staff@www.diesprinter.com (Buildipedia员工) 31 23 19脱水 星期五,2009年8月14日17:06:49 +0000 氡缓解 //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-21-13-radon-mitigation/31-21-13-radon-mitigation //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-21-13-radon-mitigation/31-21-13-radon-mitigation staff@www.diesprinter.com (Buildipedia员工) 13氡的缓解 星期五,2009年8月14日16:59:05 +0000 粗糙的分级 //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-22-00-grading/31-22-13-rough-grading/31-22-13-rough-grading //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-22-00-grading/31-22-13-rough-grading/31-22-13-rough-grading staff@www.diesprinter.com (Buildipedia员工) 31 22 13粗略分级 星期五,2009年8月14日16:59:05 +0000 完成评分 //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-22-00-grading/31-22-19-finish-grading/31-22-19-finish-grading //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-22-00-grading/31-22-19-finish-grading/31-22-19-finish-grading staff@www.diesprinter.com (Buildipedia员工) 完成评分 星期五,2009年8月14日16:59:05 +0000 回填 //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-23-2313-backfill/31-23-2313-backfill //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-23-2313-backfill/31-23-2313-backfill staff@www.diesprinter.com (Buildipedia员工) 31 23 23.13回填 星期五,2009年8月14日16:59:05 +0000 Geofoam //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-23-2343-geofoam/31-23-2343-geofoam //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-23-2343-geofoam/31-23-2343-geofoam staff@www.diesprinter.com (Buildipedia员工) 31 23 23.43 Geofoam 星期五,2009年8月14日16:59:05 +0000 侵蚀控制 //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-25-13-erosion-controls/31-25-13-erosion-controls //www.diesprinter.com/雷竞技raybeknowledgebase/division-31-earthwork/31-20-00-earth-moving/31-25-13-erosion-controls/31-25-13-erosion-controls staff@www.diesprinter.com (Buildipedia员工) 13侵蚀控制 星期五,2009年8月14日16:59:05 +0000